1       Introduction 

Reserve Policy Selection 

This simulation will review the practical application of the reserve policies, as well as a review of how those policies can be set on the back end, including the use of Input Defaults. 

We estimate that this will take 3 minutes to complete.

2       Detailed Explanation 

N-Flight Planning Reserve Policy Selection

This module will review the practical application of the various Reserve Policies available via the N-FP interface. Note that the default values for Reserve Fuel can be set in the Airline Code Parameters and/or Aircraft Characteristics.

Interaction 1

Interaction 1 Click the Reserve dropdown button.

The Reserve selection is an option within the Fuel Group on the Plan Screen.  The Reserve selection allows you to specify either a "policy", a fixed amount of fuel as a weight, a fixed amount of fuel as a time in minutes, or a percentage of the total flight time.

NAVBLUE has an extensive catalog of existing Reserve Policies.  The system can support up to 100 Reserve Policies in the Reserve drop down.  If a customer requires a policy that does not currently exist, it can be created.

Interaction 1

Interaction 1 Click the 8 list item.

The description of the Reserve Policy can be found below 

The drop down list shows policy options 0 - 100 

Interaction 1

Interaction 1 Click the green arrow next to Reserve button.

Once a new policy is selected, the description displays below. 

Interaction 1

Interaction 1 Click the Policy dropdown button.

The "Consumed Enroute" box will allow the system to burn the reserve fuel along the route of flight.

There is a similar trigger in Airline Code Parameters to allow the system to burn reserve fuel by default.

Interaction 1

Interaction 1 Click the Percent list item.

In addition to specific policies, the system will allow you to select a specific fixed fuel weight, time, or percentage.

Modified Reserves will be discussed in a separate module

Interaction 1

Interaction 1 Click the Percent input field.

If a fixed weight, time, or percentage is selected, the value can be entered in this field.

Interaction 2 Enter 5 into the Percent field.